The three stages
| Stage | When | What it finds |
|---|---|---|
| Pre-drywall | After framing, wiring, plumbing and ductwork are in, before insulation and drywall | Framing, plumbing, wiring and ductwork problems that will be hidden later. Needs the builder's permission to enter the site. |
| Pre-delivery | Just before possession, usually alongside the builder's walkthrough | Incomplete, damaged or missing items, and systems that do not work. These go on the builder's list. |
| Before the first-year warranty ends | Around the eleventh month | Defects that appear after a year of heating, cooling and settling, while they are still covered. |
How it fits with the builder's walkthrough
Before possession the builder walks you through the home and records anything damaged, incomplete or not working. In Ontario this is called the pre-delivery inspection. It is your record that an item was a problem before you moved in.
Ask the builder in advance whether your inspector can attend. Many agree; the purchase agreement may set the terms. An inspector notices things a buyer will not, such as missing attic insulation, reversed hot and cold lines or poor grading.
New home warranties by province
New home warranty rules are provincial. These are the mandatory programs in the four largest provinces; elsewhere, coverage depends on the builder and a private warranty provider.
| Province | Program | Coverage periods |
|---|---|---|
| Ontario | Tarion | 1 year for workmanship and materials, 2 years for water penetration and the main systems, 7 years for major structural defects |
| British Columbia | 2-5-10 home warranty insurance | 2 years for labour and materials, 5 years for the building envelope, 10 years for structure |
| Alberta | New home warranty (1-2-5-10) | 1 year for labour and materials, 2 years for delivery and distribution systems, 5 years for the building envelope, 10 years for structure |
| Quebec | Garantie de construction résidentielle (GCR) | Mandatory guarantee plan for most new houses and small condo buildings |
What inspectors commonly look for in new homes
- Grading and drainage: soil sloping toward the foundation, and downspouts that discharge beside it.
- Attic: missing or uneven insulation and bathroom fans vented into the attic instead of outside.
- Mechanical systems: ducts not connected, unbalanced airflow, and the ventilation system not set up.
- Plumbing: slow leaks under sinks, loose toilets and reversed hot and cold supplies.
- Electrical: outlets that do not work, missing ground-fault protection near water.
- Exterior: caulking and flashing around windows and doors, and unfinished siding or masonry details.
- Finishes: floor squeaks, drywall cracks and nail pops, doors and windows that bind.
Reporting what is found
- 1
Put everything in writing
Send the list to the builder and keep a dated copy with photos.
- 2
Use the warranty program's forms
Where a program has its own forms and submission windows, a note to the builder alone may not protect your claim.
- 3
Follow up before each deadline
The first-year deadline matters most, because it covers workmanship and finish.
- 4
Keep maintaining the home
Warranties exclude damage from lack of maintenance, such as failing to control humidity.